Recent Document Updates

21/05/2026 Jackhammer Operations Work Instruction
UPDATES:
- updates to sections 7 & 8 regarding management of train speed.
- Max train speed while jackhammering – 1km/h.

1/05/2026 Hot Work Specification
UPDATES:
-  Clarify the exception to when a 30 minute Fire Watch is required.
-  Hot Works are not to be conducted in an area in which a Fire Impairment notice has been issued unless appropriate controls to mitigate a fire have been placed.

28/04/2026 Stockyard Access Permit Form
UPDATE: Row 7 of section B checklist red box moved to “yes”.

31/03/2026 Grid Mesh, Flooring, and Handrail Removal Specification
UPDATE: Section 4.2 ACCEPTABLE WORK CONTROLS
- Dot point 1- change wording to “Isolate the restricted work area by a rigid barricade (as a primary control.”

Barricade and Safety Signage Specification
UPDATE: Section 5.2.6 Solid Barricade
- Remove reference to “Competent person” installing a hard barricade
- Additional requirement – “An outward opening gate can be installed where access to a penetration is required. In this case no kick plate is required.

Grid Mesh, Flooring or Handrail Removal Permit Form
UPDATES:
- Addition of PART C – Permit Activation section
- Addition of PART D – Permit Closure section
- minor rewording

6/01/2026 Freight Hazard Analysis Form & T4 Forklift Operation
UPDATE: 

  • Both documents have been updated to address load movement risk and load restraint standards.
  • The forklift work instruction #535544 and Freight Hazard Analysis Form (FHAF) #1969752 have both been updated to include load movement risk and load restraint standards for loading or unloading of inbound and outbound freight vehicles.
  • Please ensure you use the work instruction and FHAF for all inbound and outbound freight vehicle movements.